Question raised in Lok Sabha on Drinking Water and Sanitation Projects, 11/08/2016. Under Swachh Bharat Mission (Gramin) {SBM(G)}, the programmatic projects are sanctioned district-wise. Currently, 650 district sanitation projects have been sanctioned and under implementation. 43 districts projects have been received and sanctioned during last 3 years and current year. The State/UT wise details is at Annexure - I. No project is pending under SBM (G). The State-wise details of funds released to the States under NRDWP are at Annexure-II.

Question raised in Rajya Sabha on Conversion of census towns into statutory towns, 11/08/2016. As per Census, 2011, the total number of census towns in the country is 3892. State wise details are given in Annexure. Declaration of census towns into statutory towns is done by the respective state governments under their statues.

Question raised in Lok Sabha on Contaminated Drinking Water, 11/08/2016. As per the National Rural Drinking Water Programme (NRDWP) guidelines, 10% of the total budget is allocated to North Eastern States.

The Standing Committee on Finance present this Thirty Fourth Report on the subject "State of Rural / Agriculture Banking and Crop Insurance".

The Standing Committee on Petroleum & Natural Gas (2015-16) present this Fourteenth Report on 'Production of Coal Bed Methane (CBM)'. Coal Bed Methane (CBM) is natural gas found in coal seams and is mainly composed of Methane (CH4) with minor amounts of nitrogen, carbon dioxide and heavier hydrocarbons like ethane.

This Report of the Committee deals with the action taken by the Government on the recommendations contained in the Eighth Report (Sixteenth Lok Sabha) on the subject ‘Review of Sanitation Programme in Rural Areas' pertaining to the Ministry of Drinking Water and Sanitation.

Question raised in Lok Sabha on Power Generation, 11/08/2016. The details of various power projects commissioned during the last two years and the current year, along with the quantum of electricity generated thereof is given at Annex. The electricity generation in the country increased to 391,163.27 Million Units (MUs) during the year 2016-17 (April, 2016 to July, 2016) from 365,146.09 MUs during 2015-16 (April, 2015 to July, 2015), thus registering a growth of 7.13%.

Question raised in Lok Sabha on Pending Projects Due to Environment Clearances, 11/08/2016. As informed by Ministry of Environment, Forests & Climate Change (MoEF&CC), being the nodal Ministry for according environment clearance, fifteen Hydroelectric Projects and ten Thermal Power Projects are pending for Environmental Clearance as on 5.8.2016 as per details given in Annex-I & II respectively.

Question raised in Lok Sabha Hydro Power Plants, 11/08/2016. Nine Hydro Electric Projects, with a total capacity of 2357 MW, were commissioned during the last two years, and the current year (till 31.07.2016) in various states of the country. Out of these 9 projects (2357 MW), three projects were partially commissioned during this period and the details thereof are given at Annex-I. Detailed Project Reports (DPRs) of 15 Hydro Electric schemes with a total Installed Capacity of 8,457 MW have been received by various appraising Groups in CEA/CWC/GSI/CSMRS as on 30.6.2016 for examination.