The Union Ministry of Power has promulgated the revised consolidated Guidelines & Standards for Charging Infrastructure for Electric Vehicles (EV) on 14th January,2022. The objective is to enable a faster adoption of electric vehicles in India by ensuring safe, reliable, accessible and affordable Charging Infrastructure and eco-system.

The Ministry of Power through a notification dated 20th December, 2021 has issued the draft Electricity (Late Payment Surcharge and related matters) Rules, 2021.

The Electricity (Timely recovery of costs due to Change in Law) Rules, 2021 are aimed at ensuring timely recovery of the costs for generators due to change in law to promote investment in the power sector.

The Ministry of Power announced new rules to sustain economic viability of the sector, ease financial stress of various stakeholders and ensure timely recovery of costs involved in electricity generation.

The Union Ministry of Power has promulgated the Electricity (Transmission System Planning, Development and Recovery of Inter-State Transmission Charges) Rules 2021. This paves the way for overhauling of transmission system planning, towards giving power sector utilities easier access to the electricity transmission network across the country.

The Union Power Ministry, in a bid to promote renewable energy, issued an amendment to the Draft Electricity (Rights of Consumer) Amendment Rules, 2021.

The Ministry of Power circulated draft Electricity (Late Payment Surcharge) Amendment Rules, 2021, through it seeks to amend the norms for facilitating electricity generators to sell power to third parties. The proposed change can reduce fixed costs and cut retail tariff for electricity consumers.

The Ministry of Power has circulated the “Draft Electricity (promoting renewable energy through Green Energy Open Access) Rules, 2021”. These rules are proposed for purchase and consumption of green energy including the energy from Waste-to-Energy plants.

The Ministry of Power (MoP) has finally issued the much-awaited amendment to the Electricity (Rights of Consumers) 2020 Rules concerning net metering for rooftop solar installations. The amendment permits net metering to the prosumer for loads up to 500 kW or up to the sanctioned load, whichever is lower.

This paper, based on inputs from key stakeholders on the subject, outlines a phased introduction of MBED with Phase 1 involving only the thermal fleet of NTPC to test the efficacy of the MBED mechanism, identify deficiencies or potential issues that need to be addressed prior to a nation-wide rollout, familiarize all key stakeholders with the fr

Pages