Noor Mohammad

SHILLONG, Jan 5: Solar street lights were inaugurated at Lungwa village and Wakching village and handed over to the respective village council chairmen by the 37th Assam Rifles on behalf of IGAR(N) and DIG 7 Sector AR.

The policy framework provided in the National Solar Mission document is to enable solar technology penetration in the country, both at a centralized and decentralized level. The Ministry had started processes on the major components through a process of consultation with various Ministries as well as other stakeholders including industry and investors shortly after Cabinet approval.

After the announcement of the National Solar Mission, a Committee was set up to recommend a policy framework to encourage domestic production of raw materials and components required for expanding the domestic industrial base by identifying the critical elements/components which led themselves to indigenous manufacture and recommend the minimum indigenous content for solar power pojects, both sola

CERC's order stakeholders comments for setting of the benchmark capital cost of solar-PV for financial years 2010-11, 2011-2012 and solar-thermal projects for the years 2010-2011, 2011-2012 and 2012-13. The order also includes comments and calculations presented by stakeholders in a public hearing in February 2010.

Neena Vyas

New Delhi: Can algae be genetically engineered to produce sufficient quantities of biomass for fuel? Can

TIRUCHI:

Dubendorf Air Base (Switzerland): History is being created inside a hangar here that will radically change the way an aircraft flies. The prototype of an aircraft, to be propelled entirely by solar power even at night, has already been successfully tested for a

KOLKATA: West Bengal is expecting to generate business worth Rs. 10,000 crore from clean energies like solar power over the next ten years, Managing Director of West Bengal Green Energy Development Corporation S P Gonchaudhri said.
Trade fair

The Public Works Department has finally given the green signal to discom NDPL to install the first solar powered traffic signal at Madhuban Chowk in Rohini and Old Secretariat.

As highlighted by Newsline, the PWD had kept the discom waiting for over a year for its approval.

Pages