ANGUL: The rapid loading system at Bharatpur coal mine at Talcher, which was damaged in a fire was made operational last evening. It started functioning after one of the two sets of the damaged conveyor belts was replaced at a cost of Rs 2.50 lakh. This restored normal supply of coal to Nalco. A huge fire broke out at the loading system on December 29 damaging the merry-go-round system.
Links:
[1] http://admin.indiaenvironmentportal.org.in/news/coal-supply-nalco-resumes
[2] http://admin.indiaenvironmentportal.org.in/category/newspaper/new-indian-express-bhubaneswar
[3] http://admin.indiaenvironmentportal.org.in/category/thesaurus/national-aluminium-company-nalco
[4] http://admin.indiaenvironmentportal.org.in/category/thesaurus/coal
[5] http://admin.indiaenvironmentportal.org.in/category/thesaurus/energy
[6] http://admin.indiaenvironmentportal.org.in/category/thesaurus/orissa
[7] http://admin.indiaenvironmentportal.org.in/category/thesaurus/angul-d