Hazaribagh, April 10: The desiltation work at Hazaribagh lake has come to a halt with the National Thermal Power Corporation (NTPC) officials asking the district officials to immediately clear the mud, which has accumulated as a result of digging a small portion of the water body.
The NTPC had come forward to clean the lake after the Central Coalfields Limited (CCL) backed out.
Local MP and
Links:
[1] http://admin.indiaenvironmentportal.org.in/news/desiltation-lake-hold
[2] http://admin.indiaenvironmentportal.org.in/category/newspaper/telegraph-ranchi
[3] http://admin.indiaenvironmentportal.org.in/category/thesaurus/lakes
[4] http://admin.indiaenvironmentportal.org.in/category/thesaurus/lake-pollution
[5] http://admin.indiaenvironmentportal.org.in/category/thesaurus/jharkhand
[6] http://admin.indiaenvironmentportal.org.in/category/thesaurus/national-thermal-power-corporation-ntpc
[7] http://admin.indiaenvironmentportal.org.in/category/thesaurus/central-coalfields
[8] http://admin.indiaenvironmentportal.org.in/category/thesaurus/national-highways-authority-india-nhai