PANJIM: The Goa government has a major challenge of generating 150 MW of grid-connected solar power capacity by 2022, of which it has to produce at least one MW by the end of the current financial
Links:
[1] http://admin.indiaenvironmentportal.org.in/news/goa-generate-150-mw-grid-connected-solar-power-capacity-2022
[2] http://admin.indiaenvironmentportal.org.in/category/newspaper/herald-panjim
[3] http://admin.indiaenvironmentportal.org.in/category/thesaurus/goa
[4] http://admin.indiaenvironmentportal.org.in/category/thesaurus/solar-energy
[5] http://admin.indiaenvironmentportal.org.in/category/thesaurus/ministry-new-and-renewable-energy
[6] http://admin.indiaenvironmentportal.org.in/thesaurus/jawaharlal-nehru-national-solar-mission-jnnsm