India Environment Portal | News, reports, documents, blogs, data, analysis on environment & development | India, South Asia
Published on India Environment Portal | News, reports, documents, blogs, data, analysis on environment & development | India, South Asia (http://admin.indiaenvironmentportal.org.in)

Home > News > Planned failures > Planned failures

 Planned failures [1]

• Under phase II of GAP, Uluberia town generating 10.85 million litres per day (mld) sewage with biological oxygen demand level (BOD) of 43.07 milligrammes per litre (mg/l) was not included while Jangipur generating 0.37 mld sewage with BOD level of 34 mg/l was covered

• Between Palta (the source of Kolkata's drinking water) and Uluberia town, bod levels are considerably much higher than the permissible limits

• A Rs 17.93 lakh testing laboratory constructed at a sewage treatment plant remains unutilised till date. Instead, outside agencies have been hired for the testing.

• The total coliform count level is 10 times beyond the permissible limit at Dakshineshwar, a popular bathing site of the pilgrims.

Publication Date: 
14/09/2001
Down to Earth [2]
Tags:
Ganga [3], West Bengal [4]
Centre for Science and Environment
National Knowledge Commission Government of India

Technology Partners: MimirTech


India Environment Portal by Centre for Science and Environment is licensed under a Creative Commons Attribution-Share Alike 2.5 India License.


Source URL: http://admin.indiaenvironmentportal.org.in/news/planned-failures

Links:
[1] http://admin.indiaenvironmentportal.org.in/news/planned-failures
[2] http://admin.indiaenvironmentportal.org.in/category/newspaper/down-earth
[3] http://admin.indiaenvironmentportal.org.in/category/thesaurus/ganga
[4] http://admin.indiaenvironmentportal.org.in/category/thesaurus/west-bengal