Guidelines for Implementation of scheme for setting up of over 5000 MW Grid-Connected Solar PV Power Projects with Viability Gap Funding (VGF) under Batch-IV of Phase-II of the National Solar Mission (NSM). The scope of these guidelines is to provide the necessary policy framework and mechanism for selection and implementation of at least 5000 MW Grid-connected solar PV power projects with Viability Gap Funding under Phase-II, Batch-IV of NSM. These guidelines are independent and will have no bearing on the projects already selected under earlier schemes of NSM Phase-I & Phase-II.
Links:
[1] http://admin.indiaenvironmentportal.org.in/reports-documents/guidelines-implementation-scheme-setting-over-5000-mw-grid-connected-solar-pv-0
[2] http://admin.indiaenvironmentportal.org.in/category/publisher/ministry-new-and-renewable-energy
[3] http://admin.indiaenvironmentportal.org.in/category/thesaurus/solar-energy
[4] http://admin.indiaenvironmentportal.org.in/thesaurus/jawaharlal-nehru-national-solar-mission-jnnsm
[5] http://admin.indiaenvironmentportal.org.in/category/thesaurus/india
[6] http://admin.indiaenvironmentportal.org.in/thesaurus/grid-0
[7] http://admin.indiaenvironmentportal.org.in/category/thesaurus/finance
[8] http://admin.indiaenvironmentportal.org.in/category/thesaurus/power-transmission