Dry Tamirabarani pulls the plug on 1,050 MW Tuticorin thermal plant
CHENNAI: The Tuticorin thermal power plant with a total capacity of 1,050 MW has been shut down as the Tamirabarani river has gone dry.
Publication Date:
01/03/2017
CHENNAI: The Tuticorin thermal power plant with a total capacity of 1,050 MW has been shut down as the Tamirabarani river has gone dry.