Gridco buys 350 MW power from energy exchange
Bhubaneswar: With hydro power generation falling to an alarming level of 200-250 MW and increased power supply to the state grid by captive generating plants (CGPs) not enough to tide over peak pow
Publication Date:
05/12/2011