Industrial plant shut down in Ras Al Khaimah
The factory was shut down as it failed to use proper filters and did not safely dispose of the waste that polluted the soil in the area.
Publication Date:
06/01/2015
The factory was shut down as it failed to use proper filters and did not safely dispose of the waste that polluted the soil in the area.