One water supply scheme reaches trial run, another is stuck halfway
Actual supply will begin only after the trial run succeeds
COIMBATORE: Of the two combined water supply schemes proposed way back in 1999 for the suburbs west and south of the city, one has reached the stage of trial run, but the other is stuck halfway.
Aliyar Scheme
Publication Date:
14/04/2009