Rs 2500 crore has been spent on increasing power supply and strengthening network under ADB Project in the state during the last five years. Under the project, 220 KV and 132 KV sub stations and lines have been constructed after strengthening transmission network. As a result of this, power generation capacity has increased by 3 thousand 162 megawatts.