Sans repair, breaches galore in Indravati canal
BHAWANIPATNA: A 15-metre-long breach in the left main canal of Indravati project on April 28 damaged standing paddy crops in about 100 acres of land at Kasibahal village.
Besides, crops were damaged due to sand cast in some places and in the down stream of the canal, irrigation was affected.
Publication Date:
05/05/2010