Goa to generate 150 MW of grid-connected solar power capacity by 2022
PANJIM: The Goa government has a major challenge of generating 150 MW of grid-connected solar power capacity by 2022, of which it has to produce at least one MW by the end of the current financial
Publication Date:
06/11/2015