The Indian power sector is growing at an accelerated pace. To keep pace with generation, transmission system needs to be strengthened for power transfer from generating stations to the load centres.In this paper, the details of establishment of test station are discussed and various studies conducted for optimization of air clearancese, corona etc. are also described.