Coal shortage dogs NTPC-Kaniha plant
Power generation in the 3,000 MW NTPC-Kaniha has been drastically curtailed this month due to coal shortage.
Publication Date:
28/09/2012
Power generation in the 3,000 MW NTPC-Kaniha has been drastically curtailed this month due to coal shortage.