Cost Temporarily Reduced To Get Faster Approvals

New evidence on the irregularities in the controversial Kondhane dam in Raigad reveals that it was hurriedly commenced without a proper design. Instead of drawing up the general layout and design of the project based on the site’s needs, the Konkan Irrigation Development Corporation (KIDC) brazenly reproduced the blueprint of another dam.