Delhi seeks nod to swap gas for power plants
The Delhi Government has sought the Centre’s permission to allow it to divert the gas supply meant for the Gas Turbine Power Plant and the Indraprastha Plant to its new plant at Bawana. Doing so, will help increase production at Bawana, which is currently being run much below its installed capacity of 1500 MW.
With no additional supply of gas in sight, and the production of power at the three power plants dismally low, the Delhi Government has decided to juggle its existing supply of gas to ensure maximum utilisation of the fuel and better production of power.