Eskom’s Ingula hydro-power plant running at 25% below capacity
One of SA’s newest power plants, designed to supply the grid during peak-use periods, is defective and has been limited to operate at lower capacity.
Publication Date:
28/03/2019
![]() |
One of SA’s newest power plants, designed to supply the grid during peak-use periods, is defective and has been limited to operate at lower capacity.