Idle STP lets untreated sewage into river
The 2 MLD sewage treatment plant (STP) at Gyansu in Uttarkashi that was constructed in 2010 is lying non-functional and untreated sewage is still flowing into the Bhagirathi.
Publication Date:
19/10/2015
The 2 MLD sewage treatment plant (STP) at Gyansu in Uttarkashi that was constructed in 2010 is lying non-functional and untreated sewage is still flowing into the Bhagirathi.