The Assam Power Generation Corporation Ltd (APGCL) has taken initiatives to replace the aged gas and steam turbines of the Namrup Thermal Power Station (NTPS) with the most sophisticated turbines. The initiatives are aimed at enhancing the generation capacity of the power plant to over 140 MW with lesser gas consumption. The six NTPS turbines were installed between 1965 and 1985.