JAIPUR: A state-of-the-art boiler drum weighing 211 tonnes has been installed at a height of 75.55 metres in the first unit of 600 MW at the Kalisindh Super Thermal Power Project under construction in Jhalawar district. It is described as a significant addition to the project work.