Rajasthan to get 50% of power generated from atomic project
Rajasthan would get 50 per cent or 700 MW of the total power generated from Units 7 and 8 of the Rajasthan Atomic Power Project (RAPP) which are under construction at Rawatbhata.
Publication Date:
22/07/2011