Rooftop solar power plant at metro station
The last stop on the Blue Line of the Delhi Metro is all set to produce its own power to meet its immediate needs.
The Dwarka Sector-21 metro station will be the first to have a solar power plant installed on its rooftop with a production capacity of 500 kWp. The plant is expected to start production within six months.
Publication Date:
24/02/2014