Feasibility on waste water plants begins
The LDA and Wasa have begun working on a feasibility study for the construction of waste water treatment plants on the Ravi at two sites with a sum of Rs486 million.
Publication Date:
07/10/2013
![]() |
The LDA and Wasa have begun working on a feasibility study for the construction of waste water treatment plants on the Ravi at two sites with a sum of Rs486 million.