The Assam Electricity Regulatory Commission (AERC) has introduced the Draft Regulations for Grant of Connectivity to the Intra-State Transmission System (InSTS), 2025. These regulations aim to facilitate the integration of entities into the state transmission system effectively, reliably, and economically.