The Assam Electricity Regulatory Commission (AERC) has introduced the Draft Regulations for Grant of Connectivity to the Intra-State Transmission System (InSTS), 2025. These regulations aim to facilitate the integration of entities into the state transmission system effectively, reliably, and economically. They emphasize healthy competition in electricity generation and supply while ensuring system security. The rules will take effect from April 1, 2025, covering all applications for connectivity submitted to the State Transmission Utility (STU) from this date onward. The regulations outline eligibility criteria for entities seeking connectivity to InSTS. Entities such as power-generating stations, renewable energy generators, and distribution licensees are eligible to apply. Additionally, trading licensees and energy storage systems (ESS) are also covered. Applications must comply with specific requirements, including submission of technical and financial details. Applicants are also required to provide bank guarantees, termed Conn-BG1, Conn-BG2, and Conn-BG3, which vary based on the voltage level and augmentation needs.