This Rapid Environmental Impact Assessment Report has been prepared based on the study of impacts due to all the possible pollution loads from the infrastructure facilities to be provided by Mundra SEZ Ltd. in the SEZ. The report has been prepared based on the guidelines recommended by the Ministry of Environment and Forests (MoEF).

Application for NOC for the Air Strip construction at Mundra (21 February 2006).

Letter from Mundra Special Economic Zone Limited to Gujarat Pollution Control Board regarding NOC for proposed Air Strip (18 January 2006).