Assessment of peak maximum rainfall for estimation of peak flood for ungauged Lakya catchment - A case study

Additional image:: 

In water resources planning and management many problems are faced in estimation of flood flows in ungauged catchments. Researchers have been adopting different techniques in estimating flows from ungauged catchments for design and risk analysis of hydraulic structures. The important aspect in such situations is an assessment of Peak Maximum Rainfall (PMR).