During July 1986, hydrological studies were carried out in consultation with Central Water Commission (CWC) to estimate the Probable Maximum Flood (PMF) based on snowmelt flood peak and the Probable Maximum Precipitation (PMP) in the catchment area of the Nathpa dam.