Silt management in run-of-the river hydroelectric project - A case study
Silt management in run-of-the river hydroelectric project - A case study
The present study evaluated the options of silt disposal from Beas Satluj Link (BSL) hydroelectric project in Himachal Pradesh in India. BSL project is basically a run of the river power project, envisages diversion of about 4700 MCM per annum of Beas river water into Satlej river falling through an elevation difference at about 320 m.
Publication Date:
01/04/2008
40
2
131