Sushanta Talukdar

Guwahati: The Expert Group constituted to study the downstream impact of the ongoing 2,000-MW Subonsiri Lower hydro-electric power project of the National Hydro-electric Power Corporation (NHPC) at Gerukamukh on the Assam-Arunachal Pradesh border has recommended that the mega dam not be built at the present site.