UT to install solar power plants alongside Patiala Ki Rao
With the Ministry of New and Renewable Energy revising the solar power generation target of the UT from 30 to 100 MW by the end of 2022, the UT Administration has decided to install solar plants al
Publication Date:
10/07/2015