NHPC can’t rectify technical faults of Lower Subansiri dam: Engineer
A consultant engineer, JN Khatoniar, said on Tuesday that the Lower Subansiri Hydroelectric Project being set up at Gerukamukh along the Assam–Arunachal Pradesh border had many technical faults.
Publication Date:
09/07/2014