The Rapid Environmental Impact Assessment (EIA) and Environmental Management Plan (EMP) is being prepared for Gare IV/1 coal mine extension from the present mine lease of 705.556 Ha to 978.654 Ha and maintaining the present level of production. Jindal Steel & Power (JSPL) is doing coal mining in Gare IV/1 coal block, captive to the JSPL plant located at Raigarh.

This rapid EIA and EMP has been prepared for 2x150 mw thermal power plant to be set up at village Dongamahua, tehsil Garghoda, district Raigarh of Chhattisgarh by Jindal Steel & Power Ltd. This report addresses the environmental aspects of construction and operation of the proposed 2 X 150 mw thermal power project in district Raigarh.