Delhi Metro rushing to beat the deadlines
With 74.5 km being covered along the three existing lines, DMRC plans to add 115 km before the Games
Smriti Kak Ramachandran
Publication Date:
27/04/2009
With 74.5 km being covered along the three existing lines, DMRC plans to add 115 km before the Games
Smriti Kak Ramachandran