Krishak Mukti Sangram Samiti rejects design panel report on Subansiri dam
The Krishak Mukti Sangram Samiti (KMSS) on Monday said that it would not accept the Dam Design Review Panel (DDRP) report on the Lower Subansiri hydroelectric project at Dollungmukh in Arunachal Pr
Publication Date:
12/06/2013