NHPC to carry out protection work: Panel
The National Hydroelectric Power Corporation (NHPC) may carry out necessary protection works in the portion of 15 km in the downstream of the dam site.
Publication Date:
19/12/2012
![]() |
The National Hydroelectric Power Corporation (NHPC) may carry out necessary protection works in the portion of 15 km in the downstream of the dam site.