Wind power dips, load shedding goes up in southern districts
Industries wonder whether TANGEDCO has a contingency plan in place
With power generation from windmills steadily declining over the last few days, load shedding in southern districts has increased significantly. While the pattern of volatile wind production is a recurring one, industries say the difference this time is that wind season is drawing to a close and power generation cannot be expected to increase again consistently to peak levels.
Publication Date:
18/09/2012