Arunachal Pradesh has informed the Centre that downstream impacts can be studied during construction of the 1,750MW Lower Demwe project which should be cleared as it will not affect Dibru-Saikhowa
Guwahati, Feb. 5: The Union power ministry has called a meeting on Wednesday in Delhi to break the impasse over the 2,000-MW Lower Subansiri hydroelectric project.
The throb of the Subansiri valley will stop on the day when practically no water will be released by NHPC except in the peak period of the evening, and for all the winter months to come, the river,
Water resources minister Ramesh Chandra Sen on Sunday told the parliament that the government was selecting experts to constitute the Bangladesh side on the joint survey team for studying the impac
SILCHAR: Foundation stone for the much-hyped and politically as well as from ecological angle, the most debated multi-purpose hydel project at Tipaimukh in Manipur, popularly known as Barak Dam, wa
GUWAHATI: The Asom Gana Parishad (AGP) has alleged that the Assam Government is giving preference to the interest of the National Hydroelectric Power Corporation (NHPC) instead of to that of the pe
The Assam Government has failed to pursue the Lower Subansiri project issue honestly. This is clear from the fact that while discussions are going on and the Group of Ministers gives an impression of its goodwill to examine the problem, it is repeatedly reiterating its commitment to build the dam — Akhil Gogoi
GUWAHATI: The Group of Ministers (GoM) which has been holding talks with all the organizations which are opposed to the construction of the 2,000-MW Lower Subansiri Hydro-electric Project at Geruka
Guwahati: Reeling under unrelenting blockade of goods, fuels and machinery to its dam site at Gerukamukh along Assam-Arunachal Pradesh boundary by anti-dam protestors in Assam since December 16, th