Shishir Prashant / Dehra Dun September 07, 2009, 0:29 IST

The Centre today announced

GANGTOK, Sept 3

Sikkim Chief Minister Pawan Chamling has once again received an invitation from the Governor of California, USA, Arnold Schwarzenegger to attend the 2nd Global Climate Summit in Los Angeles beginning from September 30 this year.

Aspects of life history and morphometry of Günther’s oriental slender snake Trachischium guentheri (Boulenger, 1890) was studied along the Lachen and Lachung valleys of North Sikkim, Eastern Himalaya, India during 2003 – 2005. A total of 360 snakes were observed in 1026 man-hours of time constrained visual encounter surveys. Females were significantly larger (t = 3.19, df = 144, P

Rs 5.8 crore has been injected by the Centre into nineteen projects for tourism infrastructure development in North Sikkim during 2007-08.

The Centre has funded twelve projects as Centrally- sponsored schemes while six projects have been funded under Border Area Development Programme.

GANGTOK, Aug 10

: Gangtok, Aug 9: Comptroller and Auditor General of India has criticised Sikkim government for poor management of National Rural Health Mission (NHRM) with Rs 44.43 crore as unspent balance.

Chairperson of expert committee on hydro-power projects resigns the Union Ministry of Environment and Forests (moef) will change members or heads of expert committees if any conflict of interest is perceived in clearing projects, said union minister Jairam Ramesh. Ramesh said two of the eight expert panels would be reconstituted soon. The two panels clear mining and thermal power

The Centre has frozen six mega hydel power projects with a capacity of 1,047 MW proposed in North Sikkim following an adverse report submitted by Centre of Inter-Disciplinary Studies of Mountains and Hill Environment (CISME).

The Ministry of Environment and Forests (MoEF) had taken the CISME report seriously and derailed the six proposed hydel power projects in North Sikkim, it is learnt.

GANGTOK, July 19: Sikkim

Pages