Question raised in Rajya Sabha on Inter Linking of Minor and Major Rivers for Floods and Drought, 08/08/2016. The Government is planning to start implementing this National Project as a model link project of ILR programme, which will benefit the drought prone areas of Bundel Khand region in Uttar Pradesh and Madhya Pradesh. The present status of Inter Basin Water Transfer Links, the States involved, names of rivers and status of Feasibility Reports/Detailed Project Report (DPR) is given at Annexure.

Question raised in Rajya Sabha on Inter Linking of Minor and Major Rivers for Floods and Drought, 08/08/2016. The Government is planning to start implementing this National Project as a model link project of ILR programme, which will benefit the drought prone areas of Bundel Khand region in Uttar Pradesh and Madhya Pradesh. The present status of Inter Basin Water Transfer Links, the States involved, names of rivers and status of Feasibility Reports/Detailed Project Report (DPR) is given at Annexure.

Question raised in Rajya Sabha on Funds for disposal and recycling of e-wastes, 08/08/2016. Based on a survey carried out by the Central Pollution Control Board in 2005, the generation of e-waste in the country was assessed at 1.46 lakh ton and was estimated to exceed 8 lakh ton by 2012.

Question raised in Rajya Sabha on Development of sewage system, 08/08/2016. The NGRBA programme along with work of Ganga & its tributaries is with Ministry of Water Resources, River Development & Ganga Rejuvenation (MoWR,RD&GR) from 01/08/2014 onwards. The programmes of NRCP & NGRBA (till 31/07/2014) have covered polluted stretches of 43 rivers in 200 towns spread over 21 States, at a sanctioned cost of Rs. 12202.59 crore so far. Sewage treatment capacity of 5169 mld has been created so far under these two programmes.

Question raised in Rajya Sabha on Loss to Farmers Due to Climate Change, 05/08/2016. Agricultural land has been affected due to low rainfall in the country during last year. Eleven States, i.e. Karnataka (both for Kharif and Rabi), Chhattisgarh, Madhya Pradesh, Maharashtra (both for Kharif and Rabi), Odisha, Telangana, Uttar Pradesh (both for Kharif and Rabi), Andhra Pradesh, Jharkhand, Rajasthan and Uttarakhand (rabi) submitted Memoranda reporting crop loss due to natural calamities like drought, hailstorm, pest attack & coldwave/ frost.

Question raised in Rajya Sabha on Implementation of Pradhan Mantri Fasal Bima Yohana, 05/08/2016. Total 16 insurance companies including all concerned Public Sector Insurance Companies and 11 Private Sector General Insurance Companies have been empanelled for implementation of Pradhan Mantri Fasal Bima Yojana (PMFBY).

Question raised in Rajya Sabha on Grant to Farmers for Damage to Crops, 05/08/2016. The State Government is primarily responsible for taking necessary relief measures in the wake of natural calamities. For undertaking relief measures, funds are available with the State Government in the form of State Disaster Response Fund (SDRF).

Question raised in Rajya Sabha on Water and Air Pollution from Thermal Power Stations, 01/08/2016. Central Pollution Control Board (CPCB) has reported that all the 164 coal based thermal power plants have provided pollution control systems for control of air and water pollution.

Question raised in Rajya Sabha on Schemes for Environmental Conservation, 01/08/2016.

Question raised in Rajya Sabha on Closure of Coal Based Power Plants, 01/08/2016. State wise list of coal based power plants shut down in the country during the recent past (from April to June, 2016) along with the reasons thereof is Annexed. Coal based Thermal Power Plants are set up keeping in view the availability of land, water, fuel etc.