The study assesses segment-wise electric vehicle (EV) sales, battery requirements, public charging infrastructure necessary, and the investments needed until 2030 to support India’s EV transition. In addition to the 2030 target, the study models three transition scenarios.

India, under the Intended Nationally Determined Contribution (INDC), has set an ambitious target to achieve installed capacity of 175GW of renewable energy by 2022, including 100GW of solar power. Of that, the government aims for 60 GW to be utility-scale solar, and the rest to be rooftop solar.