This study aims to estimate the extent of and value the depletion of mineral resources and environmental costs of mining in two states of India - Madhya Pradesh and West Bengal. The study was commissioned by the Central Statistical Organization with the objective of developing a methodology and data framework for accounting for unsustainable mineral extraction in the

This report briefly summarizes the information related to Bus Rapid Transit (BRT) developments in China collected through independent research and a visit to China from April 17-26, 2006 as part of FTA Public Transportation Trade Mission. The purpose of NBRTI's participation in the mission was to visit operational BRT systems and to meet with organizations engaged in BRT planning or operations in China. By establishing initial contact with such organizations, a channel of communications has been opened to exchange information and allow for future cooperation on common problems or programs.

This report is submitted to the Hon

This report is in continuation to the EPCA report no. 21 of May 2006 The imperative of public transport: Implementing the High Capacity Bus System: a progress report which was in response to the Hon

In response to the reports on fire incidents in CNG buses in Delhi, EPCA had constituted an expert committee on May 2, 2006 to investigate the problem. This report has analysed the root cause of bus fire incidents, identified the manufacturing deficiencies and defects pertaining to the engine and sub-system design/ electric installations and electric wiring/gas piping and joints etc.

This report is in response to the Hon

This report presents the results of the third party auditing of the PUC centers. It recommends periodic audits every six months and corrective actions based on the findings of the third party auditing of the PUC centres. Presents the finding of the decoy operation in which frauds in a PUC centre was detected. Recommends strong penal action against the defaulters.

This report is in continuation of Report No. 20, May 2006. The report contains an assessment of the lambda data generated in the ongoing pilot programme to propose the lambda cut point for enforcement under PUC. The report has examined the lambda specifications provided by the vehicle manufacturers.

Abhishekh Singhvi, counsel for Dow in the Madhya Pradesh High Court case and Congress party spokesperson gives an ex-parte opinion to the Prime Minister

Dow Chemicals seeks appointment with the Prime Minister