The Vishwa Hindu Parishad on Monday demanded a complete halt to all hydroelectric project works on river Ganga in the BJP ruled Uttarakhand, saying alternative methods should be explored to generate power.

The RSS affiliate also asked both the BJP and Congress to spell out their respective policies about the hydro-electric projects being constructed on the river.

P B Jayakumar / Mumbai March 26, 2010, 0:38 IST

GMR Energy will soon raise over Rs 1,600 crore from a group of private equity players led by Singapore-based Temasek Holdings and banks to fund its expansion. The company is a subsidiary of the G M Rao-led GMR Infrastructure that has interests in highways, airports, agri-business and urban infrastructure.

With increase in power demand from the agriculture sector and lower water level in the Bhakra and Pong Dam reservoirs, there has been a sudden power crisis in Punjab. According to Punjab State Electricity Board officials, unscheduled power cuts are unavoidable because of the regulatory steps taken by the board for ensuring the security of the northern grid.

BHUBANESWAR: While the State is reeling under power crisis, the Government has not taken any proactive measures during the last 15 years to add hydro generation capacity despite huge potential.

Shimla: The hydropower developers will not be able to shift the sites of dam and power house as per the new project allotment policy, under which boundaries will be marked on the ground. They will be required to provide more free power to the government as royalty in case the capacity of the project is enhanced beyond 20 per cent after the preparation of detailed project report.

Anil Sasi

The Centre's policy document targets a near 30 per cent reduction in emission intensity (or kg of CO2 emitted for generating Re 1 of GDP) from the power sector by 2022..

Ministry plans hydro push, gas-based capacity, super-critical units

New Delhi, March 3

A quiet revolution is underway in the world of hydropower. An emerging non-dam based hydro industry holds the promise of economically viable technologies that do not deplete resources or warm the planet, and do not wipe out species, ecosystems and cultures.

L&Tis going in for a major change in its energy business focus. The country

ITANAGAR, Jan 27: Chief Minister Dorjee Khandu, informed that to expedite the official procedure in getting clearances of the projects at the shortage period, single window policy has been adopted.

LUCKNOW: After throwing open thermal power generation to private players, the UP Power Corporation Limited (UPPCL) is mulling to repeat the act with hydro power as well.

On Monday, a decision to this effect was taken at a review meeting presided over by UPPCL chairman-cum-managing director Navneet Sehgal.

Pages