Question raised in Lok Sabha on Hydro Power Projects in Backward Areas, 16/03/2017. Presently, 44 Hydro-Electric Projects (HEPs) (above 25 MW) with total installed capacity of 11,993.5 MW are under construction in the country. Out of these 44 HEPs, 21 HEPs aggregating to 6429 MW are stalled / stressed due to various reasons. The state-wise details of such HEPs vis-à-vis the reasons for delay in commissioning are given at Annex.

Question raised in Lok Sabha on Fluorides in Ground Water, 16/03/2017. State-wise number of fluoride affected habitations ( more than permissible level prescribed by Bureau of Indian Standards for drinking water) as reported by the States into Integrated Management Information System (IMIS) of the Ministry as on 10th March, 2017 is at Annexure-I.

Question raised in Lok Sabha on Employment under MGNREGS, 16/03/2017. State/UT-wise details of households demanded employment, households provided employment, households provided 100 days of employment and average days per household under the Mahatma Gandhi National Rural Employment Guarantee Scheme during the last year and current year 2016-17 (as on 10.03.2017) is at Annexure.

Question raised in Lok Sabha on Electrification of Villages, 16/03/2017. As reported by States, there were 18,452 un-electrified villages in the country as on 01.04.2015.

Question raised in Lok Sabha on Electricity Generation from Waste, 16/03/2017. The combustible fraction of Municipal Solid Waste (MSW) including domestic garbage and toilet waste can be used in several processes to generate electricity.

Question raised in Lok Sabha on Contaminated Drinking Water, 16/03/2017. It is a fact that as per the 23rd report of the Standing Committee of Rural Development, there were 3.42 lakh partially covered habitations (receiving inadequate drinking water) and 59,881 water quality affected habitations as per the Integrated Management Information System (IMIS) data as on 17/3/2016. This data is dynamic in nature and as per IMIS data as on 10/3/2017, there are now 3.30 lakh partially covered habitations and 64,094 water quality affected habitations.

Question raised in Lok Sabha on Cleaning of Ganga and Yamuna River, 16/03/2017. Government has launched Namami Gange Programme.

Question raised in Lok Sabha on Carbon emission from aviation sector, 16/03/2017.

Question raised in Lok Sabha on Villages in Forest Areas, 14/03/2017. As reported by States, in respect of tiger reserves, villages located in core/critical tiger habitat was 751. However, number of villages located in protected forest areas other than Tiger Reserves are not compiled in the Ministry. Details of villages relocated outside from Tiger Reserve/Wildlife sanctuaries are given in the Annexure.

Question raised in Lok Sabha on Tiger Population, 14/03/2017. The country level tiger estimation using the refined methodology is done once in four years. As per the assessment of the Status of Tigers, Co-predators and Prey, 2014 using the refined methodology, the tiger number has shown 30% increase countrywide with an estimated number of 2226 (range 1945-2491) as compared to 2010 estimation of 1706 (range 1520-1909 tigers). The details of tiger estimation pertaining to tiger landscapes in the country for the years 2010 and 2014 are at Annexure-I.

Pages