The Rs.253-crore flood prevention project, to strengthen the bunds of the Cauvery, Coleroon and other rivers in Tiruchi, Karur and combined Perambalur districts, would be completed within two years, Public Works Department Minister Durai Murugan has said. Chief Minister M. Karunanidhi would lay the foundation stones for this and three other projects of the Public Works Department to be taken up in Tiruchi, Thanjavur, Karur, Nagapattinam and combined Perambalur districts here on June 24.

INSPECTION: Transport Minister K.N. Nehru (right) and PWD Minister Durai Murugan near the site where the new Kattalai barrage will come up across the Cauvery at Mayanur in Karur district. The stage has been set for laying the foundation for Rs.700-crore worth of projects that will be executed by the Public Works Department in the Tiruchi Circle. Chief Minister M. Karunanidhi will launch the works in Tiruchi on June 24.

Ariyalur, the land of fossils, is found to be embedded with rich limestone deposits. Hence around 9 cement factories have been established in and around Ariyalur. This becomes one of the source of air pollution in this area.

The area chosen for study is A. Mettur. The aim of the present investigation is to conduct a door to door survey about the location of the houses, socio-economic status of the people and the problems encountered using the water was done. Bore well, well, canal, lake and river water samples were collected from different places and physico-chemical and biological parameters were analysed.

Pages