Enable Block: 

While the government wants to generate 100,000 Mw of solar power by 2022, it is yet to seriously implement steps to meet production and transmission targets

The Scope of these Guidelines is to provide the necessary policy framework and mechanism for selection and implementation of 2000 MW Grid-connected solar PV power projects with Viability Gap Funding under Phase-II, Batch-III of JNNSM.

Question raised in Rajya Sabha on progress of JNNSM, 09/03/2015.

Solar power capacity addition in the country stood at 883 MW in 2014 when compared with 1,004 MW in 2013, down 12 per cent.

Punjab's solar mission was recognized by Prime Minister Narendra Modi on Sunday with the best performing state award in renewable energy capacity building at the inaugural session of the First Rene

This is the Draft Guidelines for Implementation of Scheme for setting up of 2000 MW Grid-connected Solar PV Power Projects under JNNSM, Batch-III-Tranche-I “State Specific VGF Scheme” .

Under a proposed action plan, the ministry will strengthen grid infrastructure for wind power and identify high wind power potential zones

With a view to addressing the challenge of climate change, Prime Minister Narendra Modi today directed the ministries concerned to prepare a concept paper covering certain new areas, including heal

These guidelines are for 3000 MW. MNRE will indicate the total quantity for various States based on response received from the States. The scope of these guidelines is limited to providing the necessary policy and operational framework for development of projects under the above mentioned “State Specific Bundling Scheme”.

The primary motivation behind this research is the need to accelerate the supply of renewable energy because of the important role that it plays in mitigating climate change and in fostering sustainable development.

Pages