Chhattisgarh achieved a total commissioned capacity of 7.1000 MW from grid connected solar PV power projects as on March 31, 2014, according to the 2013-14 annual report of Union Ministry of New an
In a revamped National Solar Mission (NSM) programme, the Union Ministry of New and Renewable Energy (MNRE) has now come out with draft guidelines for setting up 3,000 MW of solar PV projects under
The National Solar Mission (NSM) launched in January 2010 is a major initiative of the GoI with active participation from States to promote utilization of solar energy to supplement the country’s energy needs.
The government is all set to reconstitute and revive the Prime Minister’s Council on Climate Change, an advisory body that has not met in the last three years, as India prepares to assess its domes
The State Government should formulate a strong solar energy policy to use solar power at cheaper costs and to meet power consumption demand particularly in difficult terrains of the State, viewed e
Power from solar energy contributed only 0.41% of overall power demand in India in 2013-14. A cumulative installed capacity (CIC) of 100 GW of solar power by 2021-22 would help scale up India’s solar capacity to 9% of total power demand.
BHOPAL: State energy department strongly objected to 'free land policy' floated by new and renewable energy department to attract mega investment in the field of solar, wind, and bio mass energy in
Giving a turnaround to the United Progressive Alliance (UPA)’s flagship solar power programme, the current government is set to double the target of the upcoming phase of Jawaharlal Nehru National